Conceptual Graphics

Proposed Margaret Hunt Hill Bridge - facing view     Proposed Margaret Hunt Hill Bridge - span view     Proposed Margaret Hunt Hill Bridge - span view
Proposed Margaret Hunt Hill Bridge - Model Photographs (above)

Vision Plan Map (upper left area of map) - Click on image to view larger image Vision Plan Map (upper right area of map) - Click on image to view larger image
Vision Plan Map (lower left area of map) - Click on image to view larger imageVision Plan Map (lower right area of map) - Click on image to view larger image
Vision Plan Map Legend

Vision Plan - The map above is divided into four sections. Mouse over a section and click on it to view a larger image of that section.
Entire Vision Plan map (Adobe PDF format)

Proposed IH30 Bridge is currently under construction, at right is a conceptual design The proposed IH-30 bridge is currently under design . It will rise to 300' at the center arch and will span 1,100 ft. It will have 11 main lanes, 1 reversible HOV lane, and 4 lanes of collector/distributor road. (Click on the graphics above to enlarge.)

A view looking upstream on the Oak Cliff side of the floodway
A view looking upstream on the Oak Cliff side of the floodway, from the Houston/Jefferson bridges. (Click on the graphic to enlarge.)

A view of the floodway looking upstream from the IH-30 bridge
A view of the floodway looking upstream from the IH-30 bridge. (Click on the graphic to enlarge.)

A view from the lake, looking over the promenade and the reunion pedestrian gateway.
A view from the lake, looking over the promenade and the reunion pedestrian gateway. (Click on the graphic to enlarge.)